NEW QUESTION 21
The primary reason that nonconforming material should be identified and segregated is
- A. So that responsibility can be determined and disciplinary action taken.
- B. So that the cause of nonconformity can be determined.
- C. So it cannot be used in production without proper authorization.
- D. To obtain samples of poor workmanship for use in the company's training program.
Answer: C
NEW QUESTION 22
Quality audits do NOT provide
- A. An index of quality needs.
- B. Answers to quality system deficiencies.
- C. An anticipated indication of customer acceptance of the product.
- D. Highlighting of faulty company operations.
Answer: B
NEW QUESTION 23
In the planning of a new major manufacturing program, the greatest quality effort should be put logically in
- A. Prevention of occurrence of substandard quality.
- B. Inspection of product.
- C. Nonconformance to specifications.
- D. Nondestructive testing equipment.
Answer: A
NEW QUESTION 24
The example of a supplier's quality management effort to meet your existing contractual requirements is MOST like
I. A product audit.
II. A process audit.
III. A system audit.
- A. I and II only
- B. II only
- C. I, II and III
- D. III only
Answer: D
Explanation:
Explanation/Reference:
NEW QUESTION 25
What are the major disadvantages of having an improvement team that is too large?
I. Difficulty in having constructive input from the entire group.
II. Difficulty in arriving at consensus.
III. Difficulty in finding large meeting facilities.
IV. Difficulty, on the part of the recorder, in keeping up with more paperwork.
- A. I and II only
- B. I only
- C. I, II, III and IV
- D. I, II and III only
Answer: A
NEW QUESTION 26
A process is in control with a defect rate of 0.2%. A sampling plans calls for 30 items to be selected at random, and for the process to be shut down and corrected if any defects are found. How often will the process be shut down without a change in the defect rate?
- A. 3.91% of the time
- B. 1.22% of the time
- C. 5.83% of the time
- D. None of the above
Answer: C
NEW QUESTION 27
An improvement in quality costs is MOST clearly indicated when:
- A. Total quality costs fall below 15% of total sales.
- B. Prevention costs increase.
- C. Appraisal and failure costs drop.
- D. Management objectives are met.
Answer: D
NEW QUESTION 28
In order to implement a continuous improvement strategy, a company may institute a steering committee or improvement council. Which of the following would generally NOT be a task performed by this council?
- A. The combined development and implementation of the company improvement strategy.
- B. The development of quality education and communication modules for the organization.
- C. The definition of certain quality objectives for sections of the company.
- D. The development of a quality vision for the company.
Answer: D
NEW QUESTION 29
The difference between setting alpha equal to 0.05 and alpha equal to 0.01 in hypothesis testing is
- A. With alpha equal to 0.05, we are more willing to risk a type II error.
- B. With alpha equal to 0.05, we are less willing to risk a type I error.
- C. With alpha equal to 0.05, we are more willing to risk a type I error.
- D. Alpha equal to 0.05 is a more "conservative" test of the null hypothesis.
Answer: C
NEW QUESTION 30
A lot is known to be 1.2% defective. Five units are randomly selected from the lot, and the lot is accepted if 1 or fewer defects are found. What is the probability of the lot being rejected?
- A. 0.01
- B. 0.9985
- C. 0.00223
- D. 0.00173
Answer: D
NEW QUESTION 31
When used together for variables data, which of the following pair is the MOST useful in preparing control charts?
- A. R, sigma
- B. AQL, p-bar
- C. p, n
- D. X-bar and R
Answer: D
NEW QUESTION 32
Regardless of the distribution of the individuals, the distribution of the average of n samples will follow which distribution as n becomes large?
- A. Lognormal.
- B. Poisson.
- C. Normal
- D. Exponential.
Answer: C
NEW QUESTION 33
Information that is received by upper management, is often distorted. Which of the following actions is effective in countering this problem?
I. Stop killing the messenger.
II. Establishing an open door policy.
III. Practice management by walking around.
- A. I and III only
- B. I and II only
- C. I only
- D. I, II and III
Answer: D
NEW QUESTION 34
Which of the following items is the MOST important consideration when selecting an audit team member?
- A. Being competent in auditing techniques.
- B. Having technical knowledge of the area being audited.
- C. Being competent in many quality control techniques.
- D. Being familiar with the organization that will be audited.
Answer: A
NEW QUESTION 35
You have been asked to sample a lot of 500 units from vendor whose past quality has been about 2% defective. A sample of 40 pieces is drawn from the lot and you have been told to reject the lot if you find two or more parts defective. What is the probability of finding two or more parts defective?
- A. 0.953
- B. 0.047
- C. 0.191
- D. 0.809
Answer: C
NEW QUESTION 36
The primary advantage of the Latin square design, compared to the factorial design, is that
- A. It allows higher significance levels.
- B. It eliminates the need for interaction analysis.
- C. In most circumstances, it requires less data.
- D. It does not require homogeneity of variance.
Answer: C
NEW QUESTION 37
Which of the following are TRUE statements regarding the use of visual inspection?
. Reference standards can be used.
. It provides consistency between inspectors.
. It is relatively expensive.
. It can be quickly performed.
- A. IIandIVonly
- B. I,IIandIVonly
- C. I,II,IIIandIV
- D. I andIVonly
Answer: D
NEW QUESTION 38
Which of the following are the MOST logical reasons for providing source inspection?
. The supplier has consistently shown poor out-going quality.
. The key inspection points are hidden after assembly at the suppliers' plant.
. The supplier requests the inspection to save them potential shipping expenses.
. The criticality of the product warrants it.
- A. IIandIVonly
- B. I,II,IIIandIV
- C. I,IIandIVonly
- D. II,IIIandIVonly
Answer: B
NEW QUESTION 39
A normal (Gaussian) distribution curve is
- A. Pear shaped.
- B. Bell shaped.
- C. Positively skewed.
- D. Dome shaped.
Answer: B
NEW QUESTION 40
A "p" chart
- A. Plots the number of defects in a sample.
- B. Can be used for only one type of defect per chart.
- C. Plots variations in dimensions.
- D. Plots either the fraction or percent defective in order of time.
Answer: D
NEW QUESTION 41
......