SAP C-SM100-7210 Exam Description:
The "SAP Certified Technology Associate - SAP Solution Manager, Mandatory and Managed System Configuration (7.2 SPS10)" certification exam validates that the candidate knows mandatory and managed system configuration of the SAP Solution Manager, including infrastructure. The exam also validates that the candidate can describe the various activities, functions and features that belongs to the SAP Solution Manager scenarios, in particular in the area of application operation.
SAP SM Certification Exam Details:
| Level | Associate |
| Reference Books | SM100 (SAP SOLUTION MANAGER 7.2 SP10) |
| Exam Name | SAP Certified Technology Associate - SAP Solution Manager Mandatory and Managed System Configuration (7.2 SPS10) |
| Exam Code | C_SM100_7210 |
| Duration | 90 mins |
NEW QUESTION 57
Which statements are correct in ref. to the responsible of PM using SolMan: (Choose four)
- A. Finalizing and managing the project scope, budget and deadlines in accordance with the approved plans
- B. Representing the project internally and externally
- C. Giving daily updates on the technical direction of the project including communicating deviations in the project
- D. Configuring the software to suit the required business processes and to meet analysis and report requirements
- E. Organizing the entire project
- F. Developing strategies and procedures for an efficient SAP implementation
Answer: A,B,E,F
NEW QUESTION 58
In the End-to-End Trace Analysis, while tracing you need to remember the following correct points:
There are 2 correct answers to this question.
Response:
- A. Therefore, it is necessary that systems be protected against such situations.
- B. Tracing with a high level could have positive impact on the system resources in the analyzed system.
- C. The system administrator can choose to allow tracing in a managed system (in Solution Manager centrally) or not
- D. It could decrease the CPU usage, as well as storage space in the database or file system.
Answer: B,D
NEW QUESTION 59
ASAP: how are accelerators?
There are 2 correct answers to this question.
Response:
- A. Accelerators are only customer documents
- B. Can contained concussed information's texts
- C. Are a collection of descriptive texts, how to documents, templates and examples of all subjects related to SAP implementation
- D. Are hardware tools used for optimizing system performance
- E. Cannot be found in the knowledge corner
Answer: B,C
NEW QUESTION 60
Which prerequisite must be satisfied before it is possible to use the Maintenance Planner?
- A. Synchronize technical systems and installation numbers from SAP Solution Manager to the SAP Support Portal
- B. Synchronize technical systems and installation numbers from the system Landscape directory to the Sap Support Portal
- C. Synchronize transport groups from the managed system to the SAP Support Portal
- D. Synchronize logical components groups from SAP Solution Manager to the SAP Support Portal
Answer: A
NEW QUESTION 61
Which of the statement is not correct for Managed Systems :
Please choose the correct answer.
Response:
- A. These managed systems can be bundled within a solution.
- B. SAP Solution Manager runs in a separate central system, to which all other SAP systems are connected. Systems that are administered using the SAP Solution Manager are referred to as managed systems.
- C. Sizing of SAP Solution Manager does not include the sizing of the managed systems , but it is strongly dependent on the size of the managed systems and on the number of managed systems connected to the solution manager.
- D. Sizing of SAP Solution Manager does include the sizing of the managed systems ,and it is not dependent on the size of the managed systems and on the number of managed systems connected to the solution manager.
Answer: C
NEW QUESTION 62
With version management SAP Solution Manager keeps track of the document history, to enables changes of existing document.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 63
The phase for implementation roadmap where you implement business and process requirements based on the Business Blueprint. Activities include customizing in the Implementation Guide, software enhancements, special programming, building and executing test plans, and signing-off the configured system.
- A. Realization
- B. Go Live and Support
- C. Final Preparation
- D. Business Blueprint
- E. Project Preparation
Answer: A
NEW QUESTION 64
Business blueprint will focus on the fallowing 5 features: (Choose five)
- A. Associated Items
- B. Business Process
- C. Blueprint Structure
- D. Business Scenarios
- E. Business Process Groups
- F. Roadmap Structure
- G. Blueprint document
Answer: A,C,D,E,G
NEW QUESTION 65
Navigation structure of roadmaps are: (Choose five)
- A. Accelerators
- B. Work package
- C. Task
- D. Activity
- E. Phase
- F. View
Answer: A,B,C,D,E
NEW QUESTION 66
In the System Monitoring work center, Connectivity Monitoring checks the status of the RFC connections from SAP Solution Manager to the following destination types except:
Please choose the correct answer.
Response:
- A. UI Destinations
- B. ABAP destinations
- C. TCP/IP destinations
- D. HTTP destinations in ABAP systems
Answer: C
NEW QUESTION 67
SAP Web application server offers:
Please select all the correct answers that apply.
Response:
- A. Convenient Development Environment
- B. Reliable, Tested runtime environment for ABAP and Java programs
- C. Support for various protocols (HTTP, RFC)
- D. Multi Level Architecture
- E. Highest Security Standards for the execution of complex business processes
- F. Operating System and Database independence
Answer: A,B,C,E
NEW QUESTION 68
"Implementing the mySAP Business Suite" supports complete implementation projects, including project preparation, business blueprint, configuration, final preparation and go live.
Please choose the correct answer.
Response:
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 69
The benefits of the testing features include: (Choose all that apply)
- A. Central storage of testing material and test results.
- B. Re-use of existing testing material.
- C. Reduced time for test preparation and execution.
- D. Single point of access to complete system landscape.
Answer: A,B,C,D
NEW QUESTION 70
Which of the following statement as regards Accelerated SAP is/are correct?
There are 3 correct answers to this question.
Response:
- A. ASAP methodology is now fully integrated with SAP Solution Manager.
- B. The purpose of ASAP is to successfully implement SAP solutions across multiple industries and
- C. customer environments
- D. ASAP was first introduced as a PC-based tool set called Economic Value Added SAP
- E. ASAP roadmaps outline the activities involve in implementing, upgrading, or enhancing SAP solutions.
Answer: A,B,E
NEW QUESTION 71
SAP IT Service and Application Management is the methodology and process model of life-Cycle Management for SAP solutions.
Please choose the correct answer.
Response:
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 72
Features of business blueprint: (Choose all that apply)
- A. Business process groups
- B. Business scenarios
- C. Associated items
- D. Blueprint structure
- E. Blueprint document
Answer: A,B,C,D,E
NEW QUESTION 73
The Integration with implementation projects makes sure that problems can already be administered during testing.
Please choose the correct answer.
Response:
- A. Correct
- B. Incorrect
Answer: B
NEW QUESTION 74
What are the benefits of Solution Manager? (Choose five)
- A. Reduced Cost of Operation
- B. Faster Return on Investment ROI
- C. Reduced ROI
- D. More Leverage from IT investment
- E. Reduced cost of implementation & continuous improvement
- F. More Reliable IT solution
Answer: A,B,D,E,F
NEW QUESTION 75
Following are the various steps that will direct you to the Service Assistant screen for setting up Service Level Reporting except:
Please choose the correct answer.
Response:
- A. The lower-right pane contains the data to be maintained within the check selected in the tree structure in the left pane.
- B. The tree structure in the left pane displays the individual checks to be performed in sequence to complete setup of a Service Level Reporting session. Initially, only one check will be present.
- C. The top-right pane provides some information on the current check selected in the tree structure in the left pane.
- D. The lower-left pane contains the data to be maintained within the check selected in the tree structure in the right pane
Answer: A
NEW QUESTION 76
Which of the following steps are required steps to upgrade SAP Solution Manager?
Note: There are 3 correct answers to this question.
- A. Perform the Dual-Stack split
- B. Perform the Value Management Dashboard Configuration
- C. Perform Delta Configuration
- D. Perform Content Activation
- E. Perform the IT Infrastructure Management
Answer: A,C,D
NEW QUESTION 77
What do you need to consider when sizing a SAP Solution Manager system? Note: There are 3 correct answers to this question.
- A. The number of available CPU in the managed systems landscape environment
- B. The scenarios implemented in SAP Solution manager and the number of documents created by scenario
- C. The total number of Java server nodes that are active on your SAP NetWeaver AS Java System
- D. The total number and role of concurrent users connecting to the SAP Solution Manager
- E. The total number of ABAP work processes that are active on your SAP NetWeaver AS ABAP systems
Answer: B,C,D
NEW QUESTION 78
Any existing projects are displayed in the Solution Manager project overview. Additional functions are available to coordinate the project administration data of a project.
Transaction SOLAR_PROJECT_ADMIN provides an overview of the active projects in the customer organization.
You can enter the following data on the General Data tab:
There are 3 correct answers to this question.
Response:
- A. Unplanned Data
- B. Assumed Data
- C. Person responsible
- D. Status
- E. Project language
Answer: B,D,E
NEW QUESTION 79
SAP Solution Manager Monitoring contains following processes. Which statement is false?
Please choose the correct answer.
Response:
- A. e-Learning Monitoring
- B. Landscape Reporting
- C. Central system Administration
- D. Solution Monitoring
- E. Service level Management
Answer: A
NEW QUESTION 80
SAP Solution Manager offers a variety of reporting options that make use of the data sets that are retrieved and stored from the weekly EarlyWatch Alert reports and system landscape maintenance (transaction SMSY).
Solution Reporting covers the following reporting options:
There are 3 correct answers to this question.
Response:
- A. Issue and Top Issue Reporting
- B. Adjustment Reporting
- C. Change Management Reporting
- D. Synergy Reporting
- E. Service Desk Reporting
Answer: A,C,E
NEW QUESTION 81
......
SAP C-SM100-7210 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| System Landscape Management (SLD, LMDB) and Process Management (SOLADM, SOLDOC) > 12% | Unit 4 and Unit 8: Describe Functions and Consumers of the System Landscape Directory (SLD), describe how to synchronize data to the Landscape Management Database (LMDB). Explain the Solution Administration and Solution Documentation function. Explain the Solution, the Logical Component Group, Logical Component and the Landscape Model. |
| System and Application Monitoring and Dashboards 8% - 12% | Unit 14 and Unit 15: Explain MAI Architecture and features. Explain the Monitoring Template concept and configuration. Explain Alert Inbox, System Monitoring and Dashboards functions. |
| SAP Solution Manager Configuration 8% - 12% | Unit 5: Describe the prerequisites for the Solution Manager configuration and explain the Guided Procedures for configuration of SAP Solution Manager. Perform the system preparation, infrastructure preparation and basic configuration. |
| Job Management 8% - 12% | Unit 12: Explain the Job Request and perform the Job Documentation function. Perform the scheduling configuration. Explain how to monitor Background Jobs and analyze Background Processing with SAP Solution Manager. |
| SAP Solution Manager System Landscape Design 8% - 12% | Unit 2: Explain the SAP Solution Manager architecture and a typical SAP Solution Manager landscape. Explain the Agent Infrastructure and planning of the Agent Infrastructure. Planning the SAP Solution Manager Landscape |
| SAP Solution Manager Enviroment and SAP Solution Manager Sizing 8% - 12% | Unit 1 and Unit 3: Describe the Application Lifecycle Management with SAP Solution Manager, Managing Authorizations in SAP Solution Manager. Describe the sizing considerations for SAP Solution Manager, describe the installation and upgrade of a SAP Solution Manager system |
| Change Management 8% - 12% | Unit 11: Explain the functions and prerequisites of the Maintenance Planner. Explain planning a system update in Maintenance Planner. Explain the License Management function and System Recommendations function. |
| SAP EarlyWatch Reports and Service Level Reporting > 12% | Unit 9 and Unit 16: Explain the SAP EarlyWatch Alert (EWA) Concept and Configuration, perform the manual Creation of an SAP EarlyWatch Alert (EWA) Report Configure Service Level Report. Produce Service Level Report and explain how to access Service Level Reports (SLR). |