NEW QUESTION # 30
In order for an ICT distribution designer to identify the BEST solutions for the client's needs they may have to provide
- A. subcontractors lists
- B. material lists (e.g., BOM).
- C. Operation and Maintenance manuals
- D. shop drawings
Answer: B
NEW QUESTION # 31
An organization is embarking on a new program aligned with its strategic objectives. The new program has a High level of risk due to the rapidly changing technical landscape in which the organization operates. The organization has mature program management capabilities, as measured by its resources, intellectual assets, and management processes.
Given the organization's history of delivering successful programs, what should the program manager do as part of the planning process?
- A. Review the organization's strategic objectives risk tolerance and compliance processes, which may provide knowledge about past programs
- B. Hire independent industry specialists and subject matter experts (SMEs) to provide additional information about market trends and uncertainties m the external environment
- C. Consult the repository developed as part of the organization's knowledge management initiative to capture best practices and lessons learned
- D. Interview the program managers and stakeholders of previous programs to learn from their experiences.
Answer: C
NEW QUESTION # 32
The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?
- A. =1858m2 (20,001 ft2)
- B. =4645 m2 (50,001 ft2)
- C. =929 m2 (10,001 ft2)
- D. =3716 m2 (40,001 ft2)
Answer: A
NEW QUESTION # 33
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)
- A. Request a variance from the contract requirements from the client.
- B. Document the reviewer's status and/or comments
- C. Request a Change Order from the client for the extra work performed.
- D. Submit an alternate product in lieu of one that was previously submitted, even if it does not meet all of the contract requirements
- E. Review the contract requirements and revise the submittal to comply with these requirements
Answer: B,E
NEW QUESTION # 34
The chief executive officer reminds a program manager that a program must deliver a 30% reduction in customer complaints by the end of the year. Where is this expectation documented1?
- A. Benefits management plan
- B. Customer management plan
- C. Benefits sustainment plan
- D. Program quality standards
Answer: A
NEW QUESTION # 35
Telecommunications systems typically combine multiple digital data streams into one data stream.
What is this process called?
- A. Wave division multiplexing (WDM)
- B. Coarse wave time division multiplexing (CWTDM)
- C. Time division multiplexing (TDM)
- D. Coarse wave division multiplexing (CWDM)
Answer: C
NEW QUESTION # 36
A company's marketing department Tails an internal compliance audit. To comply with the auditor's remediation plan the legal department mandates that a content management system (CMS) be implemented After initiating the program for CMS implementation the program manager discovers that the marketing department has already preselected which CMS technology will be implemented.
What should the program manager do to ensure the success of the program?
- A. Host a kick-off meeting, request preliminary requirements from the marketing department, conduct a design session present the steering committee with a solution that meets the requirements: and meet with interested vendors
- B. Initiate the program and begin a formal request for proposal (RFP) to validate the chosen solution and gam the confidence of the legal department
- C. Meet with the vice president of purchasing to discuss the risks associated with preselecting a solution before the requirements have been gathered
- D. Ask a senior marketing executive to act as the program sponsor and participate on the steering committee: require steering committee representation from the IT legal, and other key departments, validate that the chosen solution meets the requirements
Answer: D
NEW QUESTION # 37
A 3 trade size conduit is sized at
- A. 78 mm (3 in)
- B. 129 mm (5 in)
- C. 91 mm (3 1/2 in)
- D. 103 mm (4 in)
Answer: C
NEW QUESTION # 38
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
- A. SoW.
- B. spare ad sheet
- C. worksheet
- D. database
Answer: C
NEW QUESTION # 39
The program manager of a multinational program must reconcile data including subject matter experts* labor hour estimates and other direct resource hour estimates. In addition the program manager must prepare the cash flow analysis
Which of the following should be considered to get a baseline budget?
- A. Baseline schedule
- B. Currency exchange rates
- C. Component cost estimates
- D. Program payment schedules
Answer: C
NEW QUESTION # 40
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)
- A. Discuss design concerns with inspectors. AHJs, and other stakeholders.
- B. Verify that the overall physical security design complies with the owner expectations.
- C. Coordinate electrical supply so it is available in advance of the starting of contractor work.
- D. Ensure the construction materials are stored properly and protected from theft.
- E. Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project's critical path.
Answer: A,E
NEW QUESTION # 41
The program manager leads a medical billing system integration program for company A. a health services provider Company A acquires smaller company X. which delivers health services strategically aligned with company A Company X uses a different billing approach than company A. Company A's chief information officer (CIO) seeks counsel on which solution would be the better option moving forward requesting the program manager's assistance.
How should the program manager respond to the ClO's request1?
- A. Find similar examples of the preferred approach and ask the project teams to document why the preferred approach is better
- B. Conduct a thorough stakeholder analysis and develop a program management plan to implement the appropriate solution for both companies.
- C. Gather the costs and benefits associated with each option and recommend the appropriate solution defining why the selected approach is better
- D. Document the resources required to implement the recommended solution and demonstrate how this solution will save the company money
Answer: C
NEW QUESTION # 42
A company initiates a program to reorganize its sales and production departments. Three production departments are located at the three production plants next to the company's headquarters Five regional sales departments are located at different locations around the world.
At this stage of the program, what is the first step?
- A. Prepare a program organization chart covering both sales and production
- B. Develop a program work breakdown structure
- C. Determine and prioritize the various components of the program
- D. Identify and quantify business benefits of the program
Answer: C
NEW QUESTION # 43
A program manager concurrently implements a software program at four client locations.
The client's objective is to maintain quality while shortening the software implementation timeline
What key elements should be included in the benefits register to achieve this goal?
- A. Plans for conducting program quality assurance and control on a regular basis
- B. Plans for defining metrics and key performance indicators (KPIs), and procedures to measure benefits
- C. Plans for program schedule control to meet the shorter timeline
- D. Plans for tracking and communicating risks associated with the program
Answer: C
NEW QUESTION # 44
Which two of the following apply during a project's close out process? (Choose two.)
- A. Create schedule for completion of punch list.
- B. Begin testing of installed infrastructure.
- C. Evaluate the surroundings of the project and report back to the communications distribution professional of these findings.
- D. Communicate discrepancies to responsible parties.
- E. Hire legal council for representation.
Answer: A,D
NEW QUESTION # 45
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a
new system's cost. The program manager has provided monthly performance reports throughout the program's lite cycle.
Which of the following would the customer be interested in reviewing?
- A. Cost performance index
- B. Estimate to complete
- C. Original cost baseline
- D. Estimate at completion
Answer: D
NEW QUESTION # 46
A request for proposal (RFP) yields a bid with a better delivery schedule and a lower cost, but originates from a vendor not on the prequalified vendor list During the final review of the RFPs the program manager is informed that the new bidder is a relative of the project manager. Although the bid meets all company policies, the program manager is concerned about a conflict of interest.
What should the program manager do?
- A. Select the best bid from the prequalified vendor list
- B. Accept the bid from the new vendor and document the decision.
- C. Add the new vendor to the prequalified list and replace the project manager
- D. Advise the sponsor of a possible conflict of interest prior to awarding the bid
Answer: D
NEW QUESTION # 47
An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building B. the designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building C. Both ends are terminated with SC connectors.
What is the loss budget for the above fiber link?
- A. 3.90 dB
- B. 3.40dB
- C. 4.35 dB
- D. 2.95 dB
Answer: C
NEW QUESTION # 48
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally-induced voltages?
- A. Isolating transformers
- B. Mutual drainage reactors
- C. 2-winding neutralizing transformers
- D. Neutralizing transformers
- E. Unit-type neutralizing transformers
Answer: D
NEW QUESTION # 49
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
- A. Category 7/class F
- B. Category 6/class E
- C. Category 5e/class D
- D. Category SA/class EA
Answer: B
NEW QUESTION # 50
A program manager has four projects pending approval Senior management asks the program manager to identity a project for potential elimination based on the return on investment. The program manager has the following information to guide and support the decision.
Which project should the program manager select to be cancelled?
- A. Project C
- B. Project A
- C. Project B
- D. Project D
Answer: D
NEW QUESTION # 51
An RFQ usually provides more detail than RFP in selection material such as
- A. make
- B. mounting option
- C. delivery date
- D. color
Answer: C
NEW QUESTION # 52
An ICT distribution designer is reviewing design documents with the owner to gam approval for an ER design.
Which of the following information about the site shall be included?
- A. Suitability requirements
- B. Designer requirements
- C. Sustainability requirements
- D. Access and/or service provider requirements
Answer: D
NEW QUESTION # 53
......
Authentic Best resources for RCDDv15 Online Practice Exam: https://www.itexamreview.com/RCDDv15-exam-dumps.html
Updates Up to 365 days On Developing RCDDv15 Braindumps: https://drive.google.com/open?id=1z5VVS9Eb6VQhL7M-MWs5IRg5WLliiF6w